The Pueblo Ledger

Pueblo's public records, made public.

This Week in Pueblo · Jul 11–17, 2026

This Week in Pueblo: 0 inspections not passed, 303 permits (Jul 11–17, 2026)

Every number below is counted from the public records already on the Ledger, for the week from Saturday, Jul 11 to Friday, Jul 17. Nothing here is estimated.

Inspection data retrieved November 23, 2026; permits data retrieved November 23, 2026.

Health inspections (5)

5 inspections were recorded this week. 0 were not passed, meaning the health department's result reads "Re-Inspection Required" or "Closed". Programs without a grade (such as cannabis or waste tire) are not counted as failures.

Not passed (0)

No inspections were marked "Re-Inspection Required" or "Closed" this week.

Most violations noted

DatePlaceProgramResultViolations
2026-07-16The Capitol Downtown BarFoodPass6
2026-07-17Domino'sFoodPass4
2026-07-16(Mobile) Mimi's Shaved Ice & Ice CreamFoodPass2
2026-07-17Sinclair BaxterFoodPass2
2026-07-16SoCo Giving HeartsFoodPass1

A count of violations is not a verdict. Larger places are inspected more thoroughly, and many items are corrected on the spot.

First inspection in our records (1)

InspectedPlaceProgramAddress
2026-07-16SoCo Giving HeartsFood413 E Northern Ave, Pueblo CO 81006

These places had no earlier inspection in the Ledger's records, which begin July 2025. A place can be new, or just not inspected during that stretch.

Permits (303)

303 permit records are dated this week. By type: Mechanical permit 159, Electrical permit 48, Plumbing permit 44, Miscellaneous permit 28, Building permit 14, Complaint record 9. The permit data has no project value, so the lists below show new homes, demolitions and commercial work instead of the "biggest" jobs.

No new homes, demolitions or commercial building permits this week.

Fee rows and records without a street address are not counted. Owner names and phone numbers are never published. All permits.

Not captured this week: new business filings (the Ledger holds only the most recent filings, and this week is outside that window); the following week's public meetings (the meeting schedule the Ledger holds does not cover that week). Parts the Ledger could not count for this week are left out rather than shown as zero.

How we built this. Each section is a count and a list taken straight from the Ledger's public-record data, filled into fixed sentences by the site generator. The sources and their retrieval dates are on Data & Sources. See something wrong or missing? Send a correction or tip.