Permit 2610055
999 113 FORTINO BLVD · Filed 2026-11-16
Permit Details
| Type | Plumbing |
|---|---|
| Work Class | 002R Plumbing Other | Plumbing Repairs |
| Status | Active |
| Work Done | Plumbing Repairs |
| Notes | hook up plum ing to modular home |
| Owner | clayton homes |
| Contractor | BIG HORN MECHANICAL LLC |
| Contractor Phone | 719-671-2502 |
Inspection History
| Date | Inspector | Type | Result | Comment |
|---|---|---|---|---|
| 2026-11-17 01:12:00 | DJM | P05 - Ground Work | Rejected | Cleanouts Required 708.1.1 Correct Materials Required IPC/IRC 303.1 P2609.1 cannot stub S&D into structure. Ok to bury water only. |
| 2026-11-19 03:45:00 | FDR | P01 - Sewer Connection | Rejected | SECTION 306.2 Trenching and bedding 2021 ipc. Table 704.1 Slope of horizontal drainage pipe. 21 IPC. 603.2 Seperation of water service and building sewer. 21 IPC. |
| 2026-11-19 03:45:00 | FDR | P04 - Water Line | Complete |
Source: Pueblo Regional Building Department. PRBD transitioned to the Southern Colorado Building Department in January 2026 — verify current status at socobd.com. Retrieved November 23, 2026.