Permit 2606223

2428 POPLAR ST · Filed 2026-07-21

Permit Details

TypeMechanical
Work Class004R Mechanical Other | Gas Piping
StatusActive
Work DoneGas Piping
NotesREPLACE GAS PIPE & AIR TEST
OwnerSTEEL INVESTMENT GROUP LLC
ContractorWRIGHT-JONES PLUMBING & HEATING
Contractor Phone719-543-0055

Inspection History

DateInspectorTypeResultComment
2026-07-22 02:35:00 JJG M06 - Gas Air Test Inspection Partial (air test ok), 1-gas shut off not operational on stove terminal, 2-need to see final connections on appliances, (need to check gas flex flare fitting on stove for correct flare that came with flex) 3- need to clear combustible material from vent on roof, (1" clearance required), will not release meter until violation corrections have been completed from violation written to owner
2026-07-23 05:20:00 JJG M09 - Gas Final Partial corrections complete on gas system, (will release meter when violations have been corrected from violation written to owner)

Source: Pueblo Regional Building Department. PRBD transitioned to the Southern Colorado Building Department in January 2026 — verify current status at socobd.com. Retrieved August 03, 2026.