Permit 2605725
3534 DELANO CT · Filed 2026-07-07
Permit Details
| Type | Building |
|---|---|
| Work Class | 438 Res. Garage | DETACHED GARAGE/UNFIN. STORAGE 208 |
| Status | Active |
| Work Done | Wire New Structure |
| Notes | Not on file |
| Owner | KOSHAK |
| Contractor | RUFF 2 FINISH CONSTRUCTION LLC |
| Contractor Phone | 7194600433 |
Inspection History
| Date | Inspector | Type | Result | Comment |
|---|---|---|---|---|
| 2026-03-06 11:31:00 | JVD | E03 - Underground | Rejected | Electrical and gas lines are allowed in the same trench provided that at least 6" of separation are maintained at all times. Per mechanical code. |
| 2026-04-30 01:50:00 | JVD | E03 - Underground | Partial | Underground conduits around perimeter of new in ground pool. Multiple 1" pvc conduits are approved to cover. They run to the west to the location of the future equipment. |
| 2026-04-30 01:51:00 | JVD | E13 - Pool Grounding | Partial | Perimeter pool bonding for in ground metal pool. 4 corners and cups. Approved. |
| 2026-06-11 12:00:00 | JVD | E13 - Pool Grounding | Complete | Pool deck bonding including all 4 corners, cups and pool cover on both ends. Approved. |
| 2026-06-29 10:48:00 | APB | E08 - Electric Final | Rejected | NEED PERMIT FOR POOL BUILDING AND WIRING OF POOL BUILDING. THIS PERMIT IS FOR THE POOL AND IT'S EQUIPMENT ONLY. |
| 2026-07-10 01:12:00 | JVD | E02 - Service | Complete | Added a 100 amp underground fed subpanel on the east outside wall of a new poolhouse with 2 ground rods. |
| 2026-07-10 01:12:00 | JVD | E04 - Rough-in Electrical | Rejected | The conductors to the high outlet box in the west end south wall of the equipment room are run on the backside of the box violating the NEC 334.4D Upload a picture of the correction within 5 days. This is a rough in for a new pool house at a SFR. |
| 2026-06-05 10:09:00 | WRR | P08 - Rough-In Plumbing | Complete | pool house rough in no permit card found |
| 2026-07-02 12:18:00 | DLJ | P08 - Rough-In Plumbing | Complete | On pool house bathroom |
| 2026-07-08 11:18:00 | DDK | B04 - Frame | Complete | Will need foundation certificate before final inspection. |
| 2026-07-09 01:43:00 | JVD | E16 - Pool Final | Rejected | 1. All components must be in place for final inspection. Missing the 9 square inches of metal in contact with the water. 2. All equipment to be GFCI protected. NEC 680.32 3. All equipment/conductive surfaces to be bonded. NEC 680.26 Missing 9" square metal in contact with the water. |
Source: Pueblo Regional Building Department. PRBD transitioned to the Southern Colorado Building Department in January 2026 — verify current status at socobd.com. Retrieved July 11, 2026.